Opportunity Cost
The Payback period of solar projects and electric vehicles in Egypt, less than three years !!
Common mistakes in calculating the Payback period of solar energy projects is comparing to the cost of producing kilowatt hours of solar station or solar heater counterpart of the conventional power plants or gas heaters or diesel, as well as converting conventional vehicles to electric vehicles without taking into account the Opportunity Cost … where the state can in less than three years, the restoration of capital used to create solar energy projects and the transition to electric vehicles by reducing the consumption of petroleum products amounting to 80 million tons per year are imported about 40% of them $ 13 billion and subsidized by about 200 billion EGP/year, and the use of those petroleum products that will be made available to the downstream petrochemical industries instead of burning them in addition to the preservation of the environment and public health which is invaluable.
فترة استرداد رأسمال المشروعات الشمسية والمركبات الكهربائية في مصر اقل من ثلاث سنوات !!
من الاخطاء الشائعة في حساب فترة استرداد رأس المال المدفوع في مشروعات الطاقة الشمسية هي مقارنة تكلفة انتاج الكيلووات ساعة من المحطة الشمسية او السخان الشمسي بنظيرة من محطات الكهرباء التقليدية او السخان الغاز او الديزل وكذلك تحويل المركبات التقليدية الي المركبات الكهربائية دون الاخذ في الاعتبار تكلفة الفرصة البديلة Opportunity Cost… حيث يمكن للدولة في اقل من ثلاث سنوات استعادة رأس المال المستخدم في إنشاء مشروعات الطاقة الشمسية والتحول الي المركبات الكهربائية من خلال خفض استهلاك المواد البترولية التي تبلغ 80 مليون طن سنويا يتم استيراد حوالي 40% منها بقيمة 13 مليار دولار ويتجاوز دعمها 200 مليار جنيه سنويا، واستخدام تلك المواد البترولية الذي سيتم توفيرها للصناعات التحويلية البتروكيماوية بدلا من حرقها بالاضافة الي المحافظة على البيئة والصحة العامة التي لاتقدر بثمن.